12/30/99: The work is getting a little easier. Today's projects included: Framing a stub wall for the dangling light switches from day 5, finishing up the framing around the vent, and niche. Nailing down the sub floor, insulating the wall between the bathrooms, and installing one sheet of sheetrock. That's more than enough for one day. Ro helped out by going into the attic to get some insulation we had stored up there and then she was off the hook... not really! She spent the day cleaning the spa, getting it ready for New Years Eve and cleaning up after me.

wpe7.jpg (12191 bytes)

The dangling light switches from Day 5 are
framed in a little wall now.

wpeB.jpg (11025 bytes)

The rest of the framing around the heater vent.

wpe9.jpg (14532 bytes)

Insulation - insulating.

wpe8.jpg (9149 bytes)

One sheet installed,
two (more or less) more sheets to go.