Bathroom Day 2

Back Home Up Next

12/20/99: Let the games begin... Today I tore out the old vanity, sink (Mr Spackle was there), wall mirror, glass walls of the shower stall, the closet sliding doors and made a minor start to bashing out the old tile walls.

 

The Bathroom Phase One:
The tear-out.

wpe3.jpg (41250 bytes)

 

wpe5.jpg (27044 bytes)

Before

 

After

wpe6.jpg (51009 bytes)   wpe7.jpg (46606 bytes)

 

Go to Day 1

Go to Day 3

Back to the bathroom main page...