
![]()
1/31/00 - 2/4/00
1/31/00 - 2/4/00: Picked up the moulding on the way home from work... finally. We ordered the shower door and sides from South Bay Shower on Saturday. They will be out on Tuesday to measure. We are going to have them install it. It will have a gold frame with a big silver handle. Installed more of the baseboard and ceiling moulding. It's the first time that I actually used imitation wood (plastic) without reservations. I figure that since the moulding is in a very damp location that plastic will be better than wood for this application. (Ohmygod did I write that ?) I also installed some trim on the sink and installed our new toilet. WE HAVE A TOILET AGAIN... WOOHOO! The toilet is quiet, clean and doesn't leak. It has not been shit, pissed or puked in yet. The old toilet was thirty+ years old, loud, dirty and leaky. I remember that it had a life all of it's own. It would gurgle and squeal for no reason, the water would bubble and turn from blue to red sometimes (?)
![]() |
The new "Darth Vader" Toilet |