2/5/00 - 2/8/00
2/5/00 - 2/8/00: Installed a towel rod on the vanity, built the box that will fit into the niche by the toilet, finished the moulding, installed the closet doors, installed some shelves in the closet, installed the box into the niche, and installed the shelves in the shower.
![]() |
![]() |
Things are finally starting to come together. |
|
![]() |
![]() |
The box that fits into the niche by the terlet. |
The box installed in the niche. |
![]() |
Shelves installed in the shower. |