The Bathroom

Back Home Up Next

• Bathroom Day 1 • Bathroom Day 2 • Bathroom Day 3 • Bathroom Day 4 • Bathroom Day 5 • Bathroom Day 6 • Bathroom Day 7 • Bathroom Day 8 • Bathroom Day 9 • Bathroom Day 10 • Bathroom Day 11 • Bathroom Day 12 • Bathroom Day 13 • Bathroom Day 14 • Bathroom Day 15 • Bathroom Day 16 • Bathroom Day 17 • Bathroom Day 18 • Bathroom Day 19 • Bathroom Day 20 • Bathroom Day 21 • Bathroom Day 22 • Bathroom Day 23 • Bathroom Day 24 •

The bathroom must be the next project. Since we moved in, the black spot on the floor near the shower has grown from about 4 square inches to 144 square inches. Hopefully this black stain is "only" mildew and not anything real bad like rot or that house-eating fungus we've seen on the news.

bathroom1.jpg (21919 bytes)

The stain.

Notes:
(1) Nailing per Uniform Building Code 1994,  Table 23-I-Q.
(2) No load bearing walls were modified.
(3) Wiring per National Electric Code 1990.

Wednesday, July 11, 2007 06:59:58 PM